B2B CUSTOM FOOTWEAR ENGINEERING|STRICT 100 PAIR MOQ|TÜV RHEINLAND CERTIFIED|24H 3D VIRTUAL PROOF
How To

How to Get a 3D Proof Before Bulk Order

Last updated: 2026-10-15

Send vector artwork (.AI, .EPS or .PDF) with the construction and quantity. Our footwear engineers verify the file within 24 hours and return a 3D virtual proof showing the mark on the actual model, with placement, scale and colour. Nothing is cut or moulded until you approve it.

What exactly should a 3D proof show you?

A proof that only shows your logo on a white background is not a proof — it is a file preview. What you need to judge is the mark as it will sit on the product, which means the model, the strap area, the scale relative to the strap width, and the colour as it will be produced.

  • The mark on the actual model, not a flat artboard
  • Scale relative to the strap face — on the athletic construction, that face is 9cm
  • Colour as it will be produced, dye-matched to Pantone
  • Placement on the specific surface — strap face, footbed or outsole

What artwork should I send, and what happens if I only have a raster file?

Vector artwork in .AI, .EPS or .PDF is what we ask for, because a mould or a print path is built from paths rather than pixels. A vector file is also what lets us tell you honestly whether a detail will reproduce.

If you only have a raster image, say so up front. It can still work for UV digital printing, but it cannot be used to build a PVC mould — so the answer is that you would be choosing a printed mark rather than a raised one.

Why does the approval step matter more than the proof itself?

Because the proof is only a control if it blocks something. Nothing is cut or moulded until you approve it, which means the approval is the last point at which a wrong logo, a wrong scale or a wrong colour costs nothing.

Once tooling is cut, a change means changing the mould. That is the single most expensive mistake in a bulk order, and the proof is the mechanism that prevents it.

How long does the whole proof-to-production sequence take?

Artwork verification and the 3D proof: within 24 hours of receiving the file. Then production runs 7–10 days on smaller runs and 8–12 days on larger or more complex ones. Sea freight and DDP delivery to worldwide ports are both available, so the freight mode is a cost decision rather than a feasibility one.

StageWhat happensTiming
Artwork submissionYou send .AI / .EPS / .PDF with construction and quantity—
Verification + 3D proofFootwear engineers check the file and issue the proofWithin 24 hours
ApprovalYou approve placement, scale and colourYour call
ProductionMoulding or printing, assembly, debossing, size pairing, packing7–10 days small runs, 8–12 days larger
FreightSea freight or DDP to your portDepends on mode and destination

What should I check on the proof before approving?

Four things: that the mark is the correct version of your logo, that its scale is right relative to the strap face, that the colour is the intended reference, and that it is on the surface you expected. If any of the four is wrong, say so before approving — that is the point of the step.

Send your artwork with the construction and quantity and we will return the proof sheet with the quotation.

Frequently asked questions

How fast is a 3D proof?

Within 24 hours of receiving your vector artwork, verified by our footwear engineers.

Can you build a proof from a JPEG or PNG?

We can print from a raster file with UV digital printing, but it cannot be used to build a PVC mould. A vector file is required for a 3D molded patch.

Does the proof cost anything?

The proof is returned with the quotation, and nothing is cut or moulded until you approve it.

What happens if I change the logo after approving?

Once tooling is cut, a change means changing the mould. That is why the approval step exists — it is the last point at which a correction is free.

Related in this guide

Featured Production Models

View All 6 Footwear Silhouettes →

Get your 3D proof and bulk quotation

Send your artwork, construction and quantity. Our footwear engineering desk replies with an itemised quotation and a 3D virtual proof within 24 hours. Strict 100-pair MOQ.

MOQ 100 Pairs · 24H 3D Proof · Reply within 24H